|

Project: Canal Crossing
Location: Lockport, NY
By: John E. Christopher, Ph.D.,
P.E.
Document: Canal
Crossing (PDF)

Project: Guangzhou Baiyun International Airport
Location: Guangzhou, China
By: M. James Chen, P.E.
Document: HSS
Steel (PDF)

Project: Three-Level Steel Parking Structure
Location: Farmington, PA
By: Gene Martin, P.E. and Lena
Singer
Document: Style
On Schedule

Project: Wattana Transmission Tower
Location: Outside of Bangkok, Thailand
Designed by: PBP Steel Co.,
Ltd.
Managing Director: Capt Nattapong Buapli Rtn.
Senior Engineering Consultant: Mr. Sompoch Tiangwan
Document: Wattana
Transmission Tower

Retrofit of Boston's McArdle Bridge
By Andrew C. Coates, P.E., Paul M. Skelton, P.E., and
David S. Tuckman, P.E.

By Richard C. Pennock, P.E. and Ronald
E. Thompson, P.E.

Structural Engineer: Tetra Tech,
Inc., Memphis
Courtesy J. David Williams and Williamson Pounders Architects

State of Michigan House of Representatives
Office Building
Document: Lansing,
Michigan

New Dalian World Trade Center
Project Managers: Wang Li-chang, Zhu Wei-ping,
Li Yang
Completion Date: Spring of 2006
Document: Dilian
WTC

Pusher Furnace Facility
Engineer: John T. Whitty, P.E.
Date: N/A

First National Center
Engineer: Susan Jorgensen
Date: October 2001

Modern Steel Construction Features US
Air Hangar Designed Using STAAD.Pro
Engineer: Richard Portier and Dan Talbott
Date: October 2000

Guangdong Olympic Stadium China
Engineer: Ellerbe Becket
Date: Fall 2001

Strategic Air Command Museum
Engineer: Butler Heavy Structures
Date: September 2000

Space Truss on Top of Oil Tank in Kuwait
Engineer: Chinese Petrochemical Company
Date: May 2000

Main Water Conservancy Electricity Station
at Left Bank of Three Gorges Dam in China
Engineer: Chinese Space Flight Architectural
Design and Research Institute
Date: September 2000
|

Project: Soccer Stadium for Creighton University
Location: Omaha, NE
By: Michael Gustafson, P.E.
Document: Home
Team Advantage

Project: South American Bullfighting
Arena
Location: Colombia
By: Mauricio Gutiérrez Villa
Document: La_Macarena
(PDF)

Project: Social Security Office
Building
Location: DinDaeng, Bangkok, Thailand
Asst. Managing Director (Senior
Engineer) Civil Design and Arch: Mr. Withaya Sanchuensaku
Document: Bangkok

Dynamische Analyse der Neulandbrücke
in Leverkusen
By Landesgartenschau Leverkusen GmbH
Document: Leverkusen,
Germany

New Missisquoi Bay Bridge in Vermont
By Christopher D. Baker, P.E., and Danny L. Landry.

Structural Engineers: Dewhurst
Macfarlane and Partners, Inc., and Goldreich Engineering

Renovation of the Grand Palais
Project Manager: Thierry Baudouin
Completion Date: Spring 2005
Document: Grand
Palais

Gateway Tower

Frankfort, KY
2,000,000 Gallon Elevated Tank
Engineer/Builder: The Crom Corporation, Gainesville
Florida
Date: March 2000

Preheater Tower at Lone Star Industries
Cement Plant
Engineer: Behrent Engineering Company

MCI Center, Washington DC
Architects & Engineers: Ellerbe Becket -
Kansas City, MO

LAX Control Tower
Architects & Engineers: Holmes & Narver,
Inc. - Orange, CA

U.S. Coast Guard Hanger, Expansion/Renovation
of Air Station, Opa-Locka, FL
Architects & Engineers: O'Kon & Company,
Inc. - Atlanta, GA

Lockheed Martin
AJT & Associates
|